Improving highway 4
Highway 4 was widened and lightning was renewed in Liminka. Northern Ostrobothnia’s ELY-center has constructed the highway 4 and now Andament Ltd broaden the road between Alatemmes – Haaransilta. HSK Sähkö Ltd built the new street lighting and installed the road traffic technique. The new lighting equipment were installed for 9500m way. Lights were long lasting Sp-Na –bulbs.
2011 Improving highway 4, Several (Andament Oy)
Year: 2011
Customer: Andament Oy